1. The installation of the elbow machine shall be provided by us with the basic drawings, and the buyer shall complete the basic production in advance.Secondary grouting shall be reserved at the location with anchor bolts, and corresponding leveling pads shall be prepared on both sides of each anchor bolt.
2. Before the installation of the elbow machine, the demander shall prepare the foundation and hydropower facilities in advance and meet the installation conditions.Our company will send two professional mechanical and electrical personnel to guide equipment installation and debugging on site, and take charge of producing qualified products.
3. The elbow machine shall be carefully checked against the drawings before installation, and the foundation shall be repaired.The equipment should be installed in the process of using a level gauge to measure the elevation of each department.During installation, the equipment shall be buttoned up according to the general assembly drawing of the equipment, and the threads at both ends of the auxiliary materials shall not be damaged during operation.
Contact us
Cangzhou Aocheng Machinery Equipment co., LTD. Address : Bobei Industrial Zone, Mengcun Hui Autonomous County, Cangzhou City, Hebei Province, China Mobile : +86-15230713671 Fax : +86-317-6218625 E-mail : 15230713671@163.com Skype : zhiguang.wu