Hydraulic elbow machine mechanical equipment
Aoguang machinery manufacturing co., LTD is mainly engaged in the production of medium frequency complete set of induction equipment and hydraulic elbow machine, pipe bending machine, pipe expanding machine, cold drawing tee machine, press manufacturers, beveling machine, straightening machine, straight seam welding pipe production line, etc. The location of the company is located in the pipe fitting city of Mengcun, our company has convenient transportation, fast communication, with more than 10 years of manufacturing experience, our company produces the above pipe fitting equipment export to all over the world. The main production of pipe products, used in a variety of metal material production. The company produces pipe fitting equipment beautiful appearance, long service life, simple operation, wide application.
This series of products is the production of bending radius R=3 times more than carbon steel. Alloy steel. Stainless steel and other bending equipment. The equipment has reasonable design, reliable operation, convenient operation and good working performance. The whole equipment is composed of the main engine and the intermediate frequency heating power supply. The main engine adopts hydraulic transmission, which is convenient to realize the fast conversion of stepless speed regulation, fast forward, fast back and work forward, as well as arbitrary adjustment of thrust, stable operation and low noise. Need to adjust the product processing specifications, just change the fixture. The equipment adopts hydraulic motor to provide power, reducing the operator's labor intensity and positioning accuracy, low failure rate, reliable operation.
All users who order the above pipe fitting equipment in our company will be transported to the location designated by the customer after manufacturing, and our engineers will be responsible for on-site installation and debugging: Install the equipment according to the foundation drawing provided by the manufacturer. When installing the equipment, use the water preparation instrument to measure and find the levelness error of +2mm or -2mm. The center line of the two parts of the equipment should be in a straight line with the error of +2mm or -2mm. All the equipment has been debugged before leaving the factory. After the equipment arrives at the buyer and the water and electricity are in place, the manufacturer will send personnel to guide the installation and debugging.
During installation and commissioning, engineers introduce the operation, use, and running functions of the device to customers. Train users. Let the operator in a short period of time to operate the equipment proficient, normal operation.
|