简体中文 | English
SEARCH:
Home About us Products Press Room Service Certificate Case Show Technical Support Contact Us
You are located : Home > Press Room > Industry News >
Press Room
- Company News
- Industry News
- Products News
- faq
ProductList
Elbow Machine
Pipe Bending Machine
Mid-Frequency Induction Pipe Bending Machine
Mid-Frequency Induction Pipe Expanding Machine
Pipe Expanding Machine
Tee Machine
Hydraulic Press machine
Bevelling machine
JCO JCOE Welded Pipe Production Line
Straightening Machine
Steel Pipe Hydrostatic Pressure Tester Machine
Plate Rolling Machine
Shot Blasting Machine
Accessories
 
 
 
Industry News
 
Preparation of elbow machine before operation
Time:2022-09-16 15:32:40  Clicks:
Preparation of elbow machine before operation

The elbow machine needs to be operated before the operation process:

1. The machine must be well grounded and the lead is not less than 4mm2 copper flexible wire. Do not access the power supply voltage exceeding the specified range, do not plug in or remove the plug-in when live, and do not test the control circuit with a megohm meter. Otherwise, the device may be damaged.

2. When inserting or removing plug-ins, do not pull out wires or cables to avoid pulling out during welding.

3. Proximity switches and encoders cannot be impacted by hard objects.

4. Do not bump the display unit with sharp objects.

5. The electrical box must be placed in a ventilated place. It is forbidden to work in dust and corrosive gases.

6. Do not install without permission. Connect the PC input and output.

7. When replacing the power supply of the machine tool, the motor steering must be reconfirmed.

8. Machine tools should be kept clean, with special attention to clamping blocks. There shall be no foreign body in the slide chute.

9. Regularly add lubricating oil to the chain and other sliding parts.

10. Power supply must be disconnected during cleaning and maintenance.

11. Preparation before starting: check whether the oil level of the tank reaches the oil level line, add oil at each lubrication point, start to confirm the motor steering, check the abnormal sound of the oil pump, and check whether the hydraulic system leaks oil after starting (the Angle encoder does not allow to add oil);

12. Pressure adjustment: use the electromagnetic relief valve to adjust the pressure to ensure that the system pressure reaches the required working pressure, generally not higher than 12.5mpa.

13. Mold adjustment: mold installation requirements mold and clamping block on the center, clamping block can be adjusted by bolts; Booster block and mold to the center, booster block adjustable; Align the core head with the mold, loosen the core frame bolt, and tighten the bolt after adjusting the center.

Quick to find the product information
 
Contact us
Cangzhou Aocheng Machinery Equipment co., LTD.
Address : Bobei Industrial Zone, Mengcun Hui Autonomous County, Cangzhou City, Hebei Province, China
Mobile : +86-15230713671
Fax : +86-317-6218625
E-mail : 15230713671@163.com
Skype : zhiguang.wu
About Us |  Products |  Order Online |  Contact Us Copyright © Elbow Machine,Elbow Forming Machine,Tee Machine All Rights Reserved manage