Elbow machine before factory workflow
Elbow machine is a very important kind of manufacturing equipment, used to produce various shapes of elbow, elbow and so on. Before leaving the factory, workflows need to be inspected and tested to ensure that the accuracy, performance and reliability of the machine meet customer needs and standards.
The following is the workflow of the elbow machine before delivery:
1. Receiving raw materials
1.1 Receive steel plate, steel pipe and other raw materials, and check whether the specifications and quantities meet the requirements of the order. For abnormal or inconsistent places, it is necessary to timely feedback to the supplier or customer.
1.2 Conduct material inspection to check whether its hardness, strength, chemical composition, surface quality and other aspects meet the requirements.
Ii. Preparatory work
2.1 Determine the parameters and functional requirements of the machine according to the process flow of the elbow machine before delivery.
2.2 Prepare all necessary tools and instruments, such as measuring tools, screwdrivers, welding machines, power tools, etc.
2.3 Determine the roles and responsibilities of the staff, and conduct training and stability education to ensure smooth and stable operations.
Third, processing and manufacturing process
3.1 First of all, the overall assembly, including the base, hydraulic system, mechanical structure and other parts of the assembly.
3.2 Install the control system, electrical system and wiring of the whole elbow machine.
3.3 CNC machining of each part is carried out to ensure the accuracy and quality of each part.
3.4 Complete the hydraulic system related tests, such as pressure test, oil return test, etc.
Fourth, testing and debugging
4.1 Systematic testing and comprehensive inspection of the whole elbow machine.
4.2 Ensure that all control programs and application software work properly and are compatible.
4.3 Functional testing of various components and systems, such as saw blades, crimpers and shears.
4.4 The system can be tested for air tightness and insulation.
5. Quality inspection before leaving the factory
5.1 Measurement and calibration of the whole machine, including geometric error, motion error, positioning accuracy and other aspects of the inspection.
5.2 Check the performance and operation of the hydraulic system, such as checking the hydraulic pump, oil cylinder, hydraulic valve, tubing, etc.
5.3 Carry out durability test of the system, such as test, load test, etc.
5.4 Check the stability of the whole machine, such as the stability of the machine, the strength of the body and the stability measures.
6. Packaging and transportation of the whole machine
6.1 Select appropriate packaging materials and methods to seal and moisture-proof the whole machine.
6.2 Add relevant documents and instructions to the packaging in accordance with the technical specifications of the machine and parts.
6.3 Arrange the transportation and distribution of the whole machine according to the requirements and arrangements of customers to ensure the safe arrival of the whole machine at the destination.
The above is the workflow of the elbow machine before leaving the factory. In the entire production process, it must be inspected and tested in strict accordance with standards and specifications to ensure that the factory elbow machine fully meets customer requirements and standards, and can run stably and reliably to provide customers with excellent service and guarantee.