简体中文 | English
SEARCH:
Home About us Products Press Room Service Certificate Case Show Technical Support Contact Us
You are located : Home > Press Room > Industry News >
Press Room
- Company News
- Industry News
- Products News
- faq
ProductList
Elbow Machine
Pipe Bending Machine
Mid-Frequency Induction Pipe Bending Machine
Mid-Frequency Induction Pipe Expanding Machine
Pipe Expanding Machine
Tee Machine
Hydraulic Press machine
Bevelling machine
JCO JCOE Welded Pipe Production Line
Straightening Machine
Steel Pipe Hydrostatic Pressure Tester Machine
Plate Rolling Machine
Shot Blasting Machine
Accessories
 
 
 
Industry News
 
Assembly sequence of push machine
Time:2023-07-14 09:59:51  Clicks:

To assemble a push machine, follow this sequence:

1. First, confirm that you have received all the required push machine parts. Check that each part is consistent with the list to make sure you have everything you need.

2. Next, place the base of the push machine on the work table. Ensure that the base is stable to avoid any adverse accidents during assembly.

3. Install the motor on the base of the push machine. Install the motor in the fixing hole on the base and ensure that the output shaft of the motor is perpendicular to the base.

4. Install the gear system of the push machine. Install the gear and chain on the motor and push rod. Make sure the gears and chains are positioned correctly to ensure they run smoothly.

5. Install the push rod system. Install the push rod and connector on the gear and base. Make sure that the push rod and connector are properly placed and that nothing is loose.

6. Install the control system of the push machine. Install all control circuits and control switches on the pusher base. Make sure all wires are properly connected and that nothing is loose.

7. Debug and test. After the push unit is installed, the system is debugged and tested. Ensure that all parts of the push machine work properly and without any failure.

8. Finally, perform maintenance and maintenance. Regular inspection of the various parts of the push machine and the necessary maintenance and maintenance to ensure that the push machine can operate properly and maintain high efficiency.

The above is the basic order of assembling a push machine, by carefully following these steps, you can successfully assemble an efficient push machine. For more information about the push machine, please pay attention to our http://www.fitting-equipment.com  

Quick to find the product information
 
Contact us
Cangzhou Aocheng Machinery Equipment co., LTD.
Address : Bobei Industrial Zone, Mengcun Hui Autonomous County, Cangzhou City, Hebei Province, China
Mobile : +86-15230713671
Fax : +86-317-6218625
E-mail : 15230713671@163.com
Skype : zhiguang.wu
About Us |  Products |  Order Online |  Contact Us Copyright © Elbow Machine,Elbow Forming Machine,Tee Machine All Rights Reserved manage