Simple operation method of tee machine
There is enough safe operating space when operating the tee machine.
Before operation, you should check the power line, the surface and the tee machine have no damage, confirm the normal, and then proceed to the next process
According to the required diameter and thickness, choose the core bar, core, heater, and installed in accordance with the order
No gas substances between the pipe and the pipe mold, clear pipe dirt, uniform in the tube coated powder.
The tee machine should be clamped and concentric between the steel pipe and heater.
Adjust the process parameters, open the power supply according to the order, and run production
Operation should pay attention to check the temperature, speed, size, quality of the steel pipe surface
After the push system is completed, the tee machine tool is in production condition, the power supply is closed, and the sanitation of the tee machine and the surrounding environment is cleaned, so that the daily maintenance work can be done. |